seagullhr

Oil & Gas Construction short term Project

seagullhr

Dubai, Dubai, United Arab EmiratesFull timePosted Aug 23, 2025

Job description

Foreman

  • Piping Fabrication & Erection Fertil & Borouge shutdown plant experience 07 year : Expertise reading drawings and take of material form drawing Foreman
  • Structural Fabrication and Erection Fertil & Borouge shutdown plant experience 07 year Expertise reading drawings and take of material form drawing All candidates should have GCC experience in Oil & Gas Project Attractive salary + free food & accommodation We are looking 1 scheduler on urgent basis, kindly source profiles and share it today. Mobilization : ASAP Project duration : 3Months Salary Range : 12000-14000 FAT : BY Company Electrical Supervisors -Swit gear &Transformer 10 Nos Electrical Technician 10 Nos HSE Engineer 05 Nos Instrument Coordinator 05 Nos Instrument Supervisor 10 Nos Instrument Technician 10 Nos Job Performer (Scaffolder /Insul/Civil) 05 Nos Logistic Coordinator 05 Nos Material Coordinator 05 Nos Mechanical Supervisor- Rotating Equipment 50 Nos Mechanical Technicians -Rotating Equipment 02 Nos SIMOPS Coordinator 02 Nos Valve Coordinator 02 Nos QA/QC Engineers- Certified ASNT Level II : 05 Nos 02 Nos QC Inspectors -10 Nos QC Inspectors -10 Nos Long term Project Welders -Multi ( GTAW+SMAW ) 50 Nos Rigging Foreman 05 Nos Piping Foreman 05 Nos Short Term Project Welders -Multi ( GTAW+SMAW ) 50 Nos All candidates should have GCC experience in Oil & Gas Industry Attractive salary with free food & accommodation Requirements Tasks and Responsibilities (a) Review detail turnaround work list (work order) to ensure completeness of tasks and activities. (b) Perform field job scope verification to conform necessary resources and crafts needed to complete the turnaround activities schedule. (c) To arrange schedule with consider leveling of resources allocation and duration with timely effectiveness and availability as refer to system window schedule. (d) Maintain and update with log for any information or changing related with turnaround schedule. (e) To check and confirm detail task and activities according to correct room number/system number. (f) To prepares single schedule each work order for integrate schedule. (g) To prepares integrate schedule of the (TA) project after getting inputs from Planners. (h) Issues the resource histogram, highlighting the craft utilization and suggesting areas for Improvement. (i) To establish baseline schedule for monitoring progress of works as planning schedule. (j) Monitors the daily schedule and issues physical progress report, curves. Issues report on schedule compliance on daily basis during TA execution. (k) Prepares regular performance reports, status reports etc. suggesting area of improvements. (l) Monitor the turnaround work to ensure compliance with planned schedule and duration. (m) To update % jobs completed and establish 72 hours look ahead schedule report. (n) To update % jobs completed for the remaining activities, which can be done after execution. (o) To prepare summary of schedule as planning Vs actual for close out report. (p) To prepare equipment summary report as planning Vs actual. Competencies Required (a) Educational Qualifications
  • Bachelor/ Diploma of Engineering in Mechanical / Structural (b) Experience
  • 5 - 10 years’ experience in site engineering Description (Craft) Mobilization Date Required Qty Duration (Mechanical) – Helper 05-Jan-2026 06 Nos For ~ 45 Days (Mechanical) – Helper 20-Jan-2026 18 Nos For ~ 30 Days (Instrumentation) – Helper 20-Jan-2026 08 Nos For ~ 30 Days (Electrical) – Helper 20-Jan-2026 10 Nos For ~ 30 Days 1 Rigging Supervisor for immediate mobilization. Salary pkg 6000 to 7000 / 10hours FAT By company Visa Type Mission. Riggers : 25 No Should have GCC experience in Oil & Gas Project Attractive salary +Free Food and accommodation The candidates who are ready to travel at short notice only need to apply
  1. Fabricators - 08 (Basic1600/OA400)
  2. Fitters – 10 (Basic1200/OA300) Sr. No Craft No's Salary Working Hrs. Food Accommodation / Transport Project Duration 1 RO Operators 15 7000 10hrs By Employee By Company Long Term 2 RO Mechanical Technicians 25 2500-3000 10hrs By Employee By Company Long Term