Job description
This individual will be responsible for planning, organizing, and maintaining the Shop Floor Schedule. The SFS is a planned production assembly schedule, in weekly capacity-constrained sections, that is derived from the Master Production Schedule. The goals of the Production Scheduler are production efficiency, velocity, and on-time completion of Shop Operations and Shop Orders to Original Customer Promise.
The Production Scheduler works together with the Master Scheduler to ensure plant loading that results from the SFS neither under or overloads available capacity. The Production Scheduler also works together with Manufacturing Engineering, Purchasing, and Material Analysts to ensure plant loading from the SFS takes into consideration material availability.