City Rail Link Ltd logo

City Rail Link Ltd jobs and careers

About City Rail Link Ltd

The City Rail Link is the largest infrastructure project ever to be undertaken in New Zealand. The CRL is a 3.45km twin-tunnel underground rail link up to 42 metres below the city centre transforming the downtown Britomart Transport Centre into a two-way through-station that better connects the Auckland rail network. Auckland’s annual population growth demands the completion of this complex project within tight timeframes. The CRL team are consistently challenged with tunnelling through an established city; construction on reclaimed land; the gradient of the tunnel; and the proximity of our central Britomart station to the harbour. We are proud to say we have a Safety and Sustainability lens on all of our construction work and have embraced Maori design throughout our station design. https://www.youtube.com/watch?v=GZ_sVPhrB7o

Founded
1923
Employees
125

Leadership

The top of City Rail Link Ltd's org chart, with how many people report into each leader.

SS

Sean Sweeney

Chief Executive Officer

11 reports

WC

Wayne Cooney

Systems Director

3 reports

NM

Nicola Mills

Chief Financial Officer

2 reports

EKPhoto of Emma Kurtovich

Emma Kurtovich

General Counsel and Company Secretary

MA

Madan G Anand

Performance and Controls Director

RMPhoto of Russell McMullan

Russell McMullan

General Manager - Assurance and Integration

SE

Sumi Eratne

Programme Delivery Director

Jobs at City Rail Link Ltd

No open positions right now. Explore more companies on TheJobsMap.