Grandvalira SAETDE jobs and careers
Andorra La Vella, Andorra
About Grandvalira SAETDE
In 1956, the businessman and ski champion Francesc Viladomat installed the first ski lift on the peak of Coll Blanc in Pas de la Casa, Andorra. Powered by a lorry engine, the lift could carry up to 450 skiers per hour. Now, as part of Grandvalira, we manage the biggest Ski Resort of the South of Europe, and 16th across the planet. SAETDE is the company engaged in the technical operation of the Encamp, Grau Roig and Pas de la Casa Grandvalira sectors.
- Employees
- 501 to 1,000
- Headquarters
- Andorra La Vella
Leadership
The top of Grandvalira SAETDE's org chart, with how many people report into each leader.
FC
Francesc Camp
President
15 reports
JV
Julio Ventaja
Managing Director
14 reports
Jobs at Grandvalira SAETDE
No open positions right now. Explore more companies on TheJobsMap.