Seagullhr logo
Seagullhr

142 open roles

Multiple Opening

Abu Dhabi, Rajasthan, United Arab EmiratesFull-timePosted Nov 14, 2026

Job description

Senior Electrician MEP & Lighting Division Location: Dubai, UAE Reporting To: Site Supervisor Role Overview:- We are looking for a highly skilled, proactive, and experienced Senior Electrician to independently execute electrical installations, troubleshoot technical issues, and ensure high-quality workmanship across our MEP and Lighting projects.

Position purpose Hands-on senior electrician with foreman-level competence to independently execute, inspect and troubleshoot LV electrical works, manage helpers and coordinate specialist interfaces. This is not a commissioning engineer role. Mandatory eligibility and screening  7–10 years verifiable UAE electrical / MEP construction experience; currently recruited from India; valid ECNR passport.

 Independent ability to read shop drawings, SLDs, circuit schedules, and execute site marking, containment, wiring and DB dressing.  Agent must interview and record detailed answers, verify project experience, obtain candidate signature and arrange supervised de-energized practical tests.  Initial one-month visit visa; any site work subject to valid UAE work authorization and applicable immigration/labor requirements; employment visa decision subject to assessment and compliance.

Scope of hands-on technical responsibilities  DB dressing and panels: step-by-step dressing of a 3-phase DB from cable entry to final cover closure.; route incomers, outgoing circuits and control wiring without crossing or stressing terminations; identify phase, neutral and CPC conductors and match circuit schedules.

 LV panels and power: MDB/SMDB/DB positioning, clearances, fixing and access.; Interpret an SLD and trace the incomer to final outgoing circuit.; selection of cable termination accessories for copper/aluminum conductors.  Cable glanding and termination: Show the sequence for glanding a 4-core SWA cable into a metal enclosure.

; select gland size and type for indoor/outdoor use; earth tags, banjos, shrouds and armour continuity.  Electrical containment: setting out PVC/EMT/GI conduits from approved drawings.; calculate conduit fill and plan pull points; GI conduit bending and threaded connections..  Earthing and bonding: Differentiate protective earthing, functional earthing and equipotential bonding.

; CPC identification and termination checks.; verify metallic tray bonding and continuity.  Testing and commissioning: Demonstrate safe isolation, lockout and prove-dead sequence.; insulation resistance test preparation and sensitive equipment isolation.; continuity and polarity tests on a final circuit..  Fire alarm and emergency: fire-rated cable routing, support and identification requirements.

; dedicated FACP power supply and isolator coordination.; route fire alarm loops and avoid unwanted joints.  Lighting controls: basic DALI bus cable routing and polarity characteristics.; 0–10 V dimming cable routing and interference precautions.; wire PIR/occupancy sensors and lighting contactors from diagrams.  Outdoor and landscape: underground LV cable bedding, cover, marker tape and route recording.

; feeder pillar installation and outgoing circuit identification.; IP-rated glands, junction boxes and cable entries..  Cable pulling: cable drum positioning, rollers and safe pulling method.; observe minimum bend radius and pulling tension limits; pulling long cables through ducts/manholes..  ELV and ONU boxes: Differentiate ONU/ONT enclosure, fiber termination box and data cabinet.

; ONU box location, mounting height and maintenance access.; route fiber conduits and maintain bend radius.  BMS cables: Differentiate BMS signal, control, power and communication cables.; screened twisted-pair routing and separation from VFD/power cables.; follow cable schedules for AHU, FCU, valves and sensors.  Facade lighting containment: setting out concealed façade lighting conduit routes.

; GI conduit/tray support fixing to façade substrates.; coordinate anchor drilling with waterproofing and façade engineers.  Equipment power: local isolators for FCU, AHU, pumps and motors.; identify motor cable cores and protective earth; flexible final connections to vibrating equipment..  Builders work: coordinate slab conduit placement before casting; wall chasing, box levels and protection of embedded conduit.

; sleeves, penetrations and approved fire stopping..  Troubleshooting: how to isolate an intermittent earth leakage fault.; investigate nuisance RCD tripping; diagnosis of an open neutral or reversed polarity..  Drawings and coordination: Interpret a DB schedule and SLD against site conditions.; cable schedule and containment coordination drawings.

; produce redline as-built updates.  Safety and permits: lockout-tagout and prove-dead procedure.; What is your response if asked to work live without authorization; working-at-height rescue planning for façade works..  Feeder pillars and trenching: feeder pillar plinth, level and cable entry preparation.; armoured cable route through ducts and manholes.

; protect duct entries from abrasion and water ingress.  LED strips and profiles: LED strip polarity, voltage drop and maximum run lengths.; install aluminum profiles for heat dissipation; solder less connections versus approved soldered joints..  Lightning protection and SPD: Identify air terminals, down conductors and test joints.

; bonding requirements at lightning protection interfaces.; SPD types 1, 2 and 3 at a basic installation level..  Retrofit and UPS solar: circuit tracing before modifying an existing DB.; shutdown approval, temporary supply and restoration checklist.; basic UPS input/output/bypass cable identification..  Material identification: Identify MCB, MCCB, RCCB and RCBO from photographs.

; Identify glands, lugs, ferrules, busbar links and heat shrink.; Differentiate XLPE/SWA/PVC, LSZH and fire-rated cables.. Quality, safety and site leadership  Carry out approved site marking, material take-off, daily planning, coordination with civil/HVAC/ELV/fire alarm teams, installation checks and as-built redlines.

 Install and test only within competence and authorization; follow permit-to-work, LOTO, prove-dead, calibrated instruments, working-at-height and approved method statements.  Maintain segregation, earthing/bonding, cable identification, manufacturer torque and IP integrity; prevent hidden joints, unsafe live work and undocumented modifications.

 Support ONU, BMS, fire alarm, lighting controls, UPS/solar and lightning protection interfaces; specialist termination/commissioning only by authorized qualified personnel. Selection and assessment Complete structured pre qualification questionnaire; supervised practical test (DB dressing, armoured cable glanding, containment, safe testing, troubleshooting and specialist interface tasks); verify photos and references.

Suggested minimum 75% technical and 70% practical, with no critical safety failure. Scores are screening aids, not substitutes for competent supervision. Performance expectations Own workmanship quality, safety, productivity, material control, timely snag closure, circuit documentation and coaching of junior electricians.

SENIOR PLUMBER – LEAD FIELD INSTALLER Department MEP – Plumbing Services Experience 7–10+ years practical plumbing experience; previous UAE experience mandatory Recruitment Candidates currently in India with previous UAE experience Employment Full-time 1.

Position Overview

We seek a technically strong, energetic and self-motivated Senior Plumber who can personally execute installations, guide junior workers and independently take charge of assigned site areas. This is a hands-on field position requiring foreman-level technical knowledge, initiative, accountability and daily productivity—not a supervisory-only role. 2. Technical Installation Experience Water Supply and Pipework  Install PPR, PEX, HDPE, CPVC, copper and applicable piping systems; perform cutting, fusion/jointing and fittings.  Execute concealed, exposed, ceiling and underground water supply networks, including supports, sleeves and insulation.  Install valves, manifolds, meters, pressure-reducing valves and associated accessories; mark routes and levels from drawings. Drainage and Sanitary  Install UPVC/HDPE soil, waste, vent and rainwater piping with correct slopes, supports and connections.  Install floor traps, cleanouts, gullies and sanitary fixtures including WCs, basins, showers and kitchen sinks.  Complete bathroom, kitchen, apartment and villa plumbing independently. Equipment, Testing and Troubleshooting  Install/connect domestic pumps, booster sets, water heaters, tanks and associated pipework.  Perform water pressure and drainage leakage tests as per approved procedures.  Diagnose and rectify leaks, blockages, low pressure, airlocks and installation defects; prepare for inspection and handover. 3. Independent Site Execution  Read approved plumbing drawings, identify installation sequences and execute assigned work without constant supervision.  Plan daily targets, materials, tools and manpower; flag shortages before they stop work.  Guide plumbers/helpers while personally carrying out critical installation work.  Coordinate with civil, electrical and HVAC teams; identify clashes and propose practical solutions.  Track progress, quality, safety and housekeeping; communicate issues and completion status to management. 4. Work Attitude and Ownership  Take initiative and move to the next productive activity without repeated instructions.  Lead by example on site; remain actively involved in installation rather than sitting and supervising.  Take responsibility for workmanship, productivity, material care, mistakes and timely rectification.  Solve routine technical problems independently; escalate changes requiring approval.  Maintain discipline, enthusiasm, teamwork and a target-oriented approach. 5. Minimum Requirements  7–10+ years of practical plumbing installation experience, with verifiable previous UAE MEP/construction experience.  Hands-on experience in villas, apartments, residential towers or commercial buildings.  Ability to interpret basic plumbing drawings, execute installations independently and troubleshoot faults.  Experience guiding helpers or junior plumbers preferred; must be physically able to work on site.  Candidates currently in India with prior UAE employment are encouraged to apply. 6. Pre-Hiring Screening  Provide updated CV, previous UAE employers, project names and employment periods.  Describe systems and activities personally installed, plus areas handled independently.  Provide salary expectation, availability and references where possible.  Shortlisted candidates will complete an experience checklist, technical interview and practical trade assessment where feasible. 7. Performance Expectations Complete assigned areas safely and to quality standards; achieve realistic daily targets; minimize rework and downtime; guide helpers productively; proactively report constraints and take ownership through testing and rectification. Hiring Priority We value practical capability, self-initiative and responsibility more than designation alone. We need someone who works like a skilled plumber, thinks like a foreman and takes ownership like a site in-charge.

Requirements

Senior Electrician MEP & Lighting Division Location: Dubai, UAE Reporting To: Site Supervisor Role Overview:- We are looking for a highly skilled, proactive, and experienced Senior Electrician to independently execute electrical installations, troubleshoot technical issues, and ensure high-quality workmanship across our MEP and Lighting projects.

Position purpose Hands-on senior electrician with foreman-level competence to independently execute, inspect and troubleshoot LV electrical works, manage helpers and coordinate specialist interfaces. This is not a commissioning engineer role. Mandatory eligibility and screening  7–10 years verifiable UAE electrical / MEP construction experience; currently recruited from India; valid ECNR passport.

 Independent ability to read shop drawings, SLDs, circuit schedules, and execute site marking, containment, wiring and DB dressing.  Agent must interview and record detailed answers, verify project experience, obtain candidate signature and arrange supervised de-energized practical tests.  Initial one-month visit visa; any site work subject to valid UAE work authorization and applicable immigration/labor requirements; employment visa decision subject to assessment and compliance.

Scope of hands-on technical responsibilities  DB dressing and panels: step-by-step dressing of a 3-phase DB from cable entry to final cover closure.; route incomers, outgoing circuits and control wiring without crossing or stressing terminations; identify phase, neutral and CPC conductors and match circuit schedules.

 LV panels and power: MDB/SMDB/DB positioning, clearances, fixing and access.; Interpret an SLD and trace the incomer to final outgoing circuit.; selection of cable termination accessories for copper/aluminum conductors.  Cable glanding and termination: Show the sequence for glanding a 4-core SWA cable into a metal enclosure.

; select gland size and type for indoor/outdoor use; earth tags, banjos, shrouds and armour continuity.  Electrical containment: setting out PVC/EMT/GI conduits from approved drawings.; calculate conduit fill and plan pull points; GI conduit bending and threaded connections..  Earthing and bonding: Differentiate protective earthing, functional earthing and equipotential bonding.

; CPC identification and termination checks.; verify metallic tray bonding and continuity.  Testing and commissioning: Demonstrate safe isolation, lockout and prove-dead sequence.; insulation resistance test preparation and sensitive equipment isolation.; continuity and polarity tests on a final circuit..  Fire alarm and emergency: fire-rated cable routing, support and identification requirements.

; dedicated FACP power supply and isolator coordination.; route fire alarm loops and avoid unwanted joints.  Lighting controls: basic DALI bus cable routing and polarity characteristics.; 0–10 V dimming cable routing and interference precautions.; wire PIR/occupancy sensors and lighting contactors from diagrams.  Outdoor and landscape: underground LV cable bedding, cover, marker tape and route recording.

; feeder pillar installation and outgoing circuit identification.; IP-rated glands, junction boxes and cable entries..  Cable pulling: cable drum positioning, rollers and safe pulling method.; observe minimum bend radius and pulling tension limits; pulling long cables through ducts/manholes..  ELV and ONU boxes: Differentiate ONU/ONT enclosure, fiber termination box and data cabinet.

; ONU box location, mounting height and maintenance access.; route fiber conduits and maintain bend radius.  BMS cables: Differentiate BMS signal, control, power and communication cables.; screened twisted-pair routing and separation from VFD/power cables.; follow cable schedules for AHU, FCU, valves and sensors.  Facade lighting containment: setting out concealed façade lighting conduit routes.

; GI conduit/tray support fixing to façade substrates.; coordinate anchor drilling with waterproofing and façade engineers.  Equipment power: local isolators for FCU, AHU, pumps and motors.; identify motor cable cores and protective earth; flexible final connections to vibrating equipment..  Builders work: coordinate slab conduit placement before casting; wall chasing, box levels and protection of embedded conduit.

; sleeves, penetrations and approved fire stopping..  Troubleshooting: how to isolate an intermittent earth leakage fault.; investigate nuisance RCD tripping; diagnosis of an open neutral or reversed polarity..  Drawings and coordination: Interpret a DB schedule and SLD against site conditions.; cable schedule and containment coordination drawings.

; produce redline as-built updates.  Safety and permits: lockout-tagout and prove-dead procedure.; What is your response if asked to work live without authorization; working-at-height rescue planning for façade works..  Feeder pillars and trenching: feeder pillar plinth, level and cable entry preparation.; armoured cable route through ducts and manholes.

; protect duct entries from abrasion and water ingress.  LED strips and profiles: LED strip polarity, voltage drop and maximum run lengths.; install aluminum profiles for heat dissipation; solder less connections versus approved soldered joints..  Lightning protection and SPD: Identify air terminals, down conductors and test joints.

; bonding requirements at lightning protection interfaces.; SPD types 1, 2 and 3 at a basic installation level..  Retrofit and UPS solar: circuit tracing before modifying an existing DB.; shutdown approval, temporary supply and restoration checklist.; basic UPS input/output/bypass cable identification..  Material identification: Identify MCB, MCCB, RCCB and RCBO from photographs.

; Identify glands, lugs, ferrules, busbar links and heat shrink.; Differentiate XLPE/SWA/PVC, LSZH and fire-rated cables.. Quality, safety and site leadership  Carry out approved site marking, material take-off, daily planning, coordination with civil/HVAC/ELV/fire alarm teams, installation checks and as-built redlines.

 Install and test only within competence and authorization; follow permit-to-work, LOTO, prove-dead, calibrated instruments, working-at-height and approved method statements.  Maintain segregation, earthing/bonding, cable identification, manufacturer torque and IP integrity; prevent hidden joints, unsafe live work and undocumented modifications.

 Support ONU, BMS, fire alarm, lighting controls, UPS/solar and lightning protection interfaces; specialist termination/commissioning only by authorized qualified personnel. Selection and assessment Complete structured pre qualification questionnaire; supervised practical test (DB dressing, armoured cable glanding, containment, safe testing, troubleshooting and specialist interface tasks); verify photos and references.

Suggested minimum 75% technical and 70% practical, with no critical safety failure. Scores are screening aids, not substitutes for competent supervision. Performance expectations Own workmanship quality, safety, productivity, material control, timely snag closure, circuit documentation and coaching of junior electricians.

SENIOR PLUMBER – LEAD FIELD INSTALLER Department MEP – Plumbing Services Experience 7–10+ years practical plumbing experience; previous UAE experience mandatory Recruitment Candidates currently in India with previous UAE experience Employment Full-time 1.

Position Overview

We seek a technically strong, energetic and self-motivated Senior Plumber who can personally execute installations, guide junior workers and independently take charge of assigned site areas. This is a hands-on field position requiring foreman-level technical knowledge, initiative, accountability and daily productivity—not a supervisory-only role. 2. Technical Installation Experience Water Supply and Pipework  Install PPR, PEX, HDPE, CPVC, copper and applicable piping systems; perform cutting, fusion/jointing and fittings.  Execute concealed, exposed, ceiling and underground water supply networks, including supports, sleeves and insulation.  Install valves, manifolds, meters, pressure-reducing valves and associated accessories; mark routes and levels from drawings. Drainage and Sanitary  Install UPVC/HDPE soil, waste, vent and rainwater piping with correct slopes, supports and connections.  Install floor traps, cleanouts, gullies and sanitary fixtures including WCs, basins, showers and kitchen sinks.  Complete bathroom, kitchen, apartment and villa plumbing independently. Equipment, Testing and Troubleshooting  Install/connect domestic pumps, booster sets, water heaters, tanks and associated pipework.  Perform water pressure and drainage leakage tests as per approved procedures.  Diagnose and rectify leaks, blockages, low pressure, airlocks and installation defects; prepare for inspection and handover. 3. Independent Site Execution  Read approved plumbing drawings, identify installation sequences and execute assigned work without constant supervision.  Plan daily targets, materials, tools and manpower; flag shortages before they stop work.  Guide plumbers/helpers while personally carrying out critical installation work.  Coordinate with civil, electrical and HVAC teams; identify clashes and propose practical solutions.  Track progress, quality, safety and housekeeping; communicate issues and completion status to management. 4. Work Attitude and Ownership  Take initiative and move to the next productive activity without repeated instructions.  Lead by example on site; remain actively involved in installation rather than sitting and supervising.  Take responsibility for workmanship, productivity, material care, mistakes and timely rectification.  Solve routine technical problems independently; escalate changes requiring approval.  Maintain discipline, enthusiasm, teamwork and a target-oriented approach. 5. Minimum Requirements  7–10+ years of practical plumbing installation experience, with verifiable previous UAE MEP/construction experience.  Hands-on experience in villas, apartments, residential towers or commercial buildings.  Ability to interpret basic plumbing drawings, execute installations independently and troubleshoot faults.  Experience guiding helpers or junior plumbers preferred; must be physically able to work on site.  Candidates currently in India with prior UAE employment are encouraged to apply. 6. Pre-Hiring Screening  Provide updated CV, previous UAE employers, project names and employment periods.  Describe systems and activities personally installed, plus areas handled independently.  Provide salary expectation, availability and references where possible.  Shortlisted candidates will complete an experience checklist, technical interview and practical trade assessment where feasible. 7. Performance Expectations Complete assigned areas safely and to quality standards; achieve realistic daily targets; minimize rework and downtime; guide helpers productively; proactively report constraints and take ownership through testing and rectification. Hiring Priority We value practical capability, self-initiative and responsibility more than designation alone. We need someone who works like a skilled plumber, thinks like a foreman and takes ownership like a site in-charge.

Benefits

Senior Electrician MEP & Lighting Division Location: Dubai, UAE Reporting To: Site Supervisor Role Overview:- We are looking for a highly skilled, proactive, and experienced Senior Electrician to independently execute electrical installations, troubleshoot technical issues, and ensure high-quality workmanship across our MEP and Lighting projects.

Position purpose Hands-on senior electrician with foreman-level competence to independently execute, inspect and troubleshoot LV electrical works, manage helpers and coordinate specialist interfaces. This is not a commissioning engineer role. Mandatory eligibility and screening  7–10 years verifiable UAE electrical / MEP construction experience; currently recruited from India; valid ECNR passport.

 Independent ability to read shop drawings, SLDs, circuit schedules, and execute site marking, containment, wiring and DB dressing.  Agent must interview and record detailed answers, verify project experience, obtain candidate signature and arrange supervised de-energized practical tests.  Initial one-month visit visa; any site work subject to valid UAE work authorization and applicable immigration/labor requirements; employment visa decision subject to assessment and compliance.

Scope of hands-on technical responsibilities  DB dressing and panels: step-by-step dressing of a 3-phase DB from cable entry to final cover closure.; route incomers, outgoing circuits and control wiring without crossing or stressing terminations; identify phase, neutral and CPC conductors and match circuit schedules.

 LV panels and power: MDB/SMDB/DB positioning, clearances, fixing and access.; Interpret an SLD and trace the incomer to final outgoing circuit.; selection of cable termination accessories for copper/aluminum conductors.  Cable glanding and termination: Show the sequence for glanding a 4-core SWA cable into a metal enclosure.

; select gland size and type for indoor/outdoor use; earth tags, banjos, shrouds and armour continuity.  Electrical containment: setting out PVC/EMT/GI conduits from approved drawings.; calculate conduit fill and plan pull points; GI conduit bending and threaded connections..  Earthing and bonding: Differentiate protective earthing, functional earthing and equipotential bonding.

; CPC identification and termination checks.; verify metallic tray bonding and continuity.  Testing and commissioning: Demonstrate safe isolation, lockout and prove-dead sequence.; insulation resistance test preparation and sensitive equipment isolation.; continuity and polarity tests on a final circuit..  Fire alarm and emergency: fire-rated cable routing, support and identification requirements.

; dedicated FACP power supply and isolator coordination.; route fire alarm loops and avoid unwanted joints.  Lighting controls: basic DALI bus cable routing and polarity characteristics.; 0–10 V dimming cable routing and interference precautions.; wire PIR/occupancy sensors and lighting contactors from diagrams.  Outdoor and landscape: underground LV cable bedding, cover, marker tape and route recording.

; feeder pillar installation and outgoing circuit identification.; IP-rated glands, junction boxes and cable entries..  Cable pulling: cable drum positioning, rollers and safe pulling method.; observe minimum bend radius and pulling tension limits; pulling long cables through ducts/manholes..  ELV and ONU boxes: Differentiate ONU/ONT enclosure, fiber termination box and data cabinet.

; ONU box location, mounting height and maintenance access.; route fiber conduits and maintain bend radius.  BMS cables: Differentiate BMS signal, control, power and communication cables.; screened twisted-pair routing and separation from VFD/power cables.; follow cable schedules for AHU, FCU, valves and sensors.  Facade lighting containment: setting out concealed façade lighting conduit routes.

; GI conduit/tray support fixing to façade substrates.; coordinate anchor drilling with waterproofing and façade engineers.  Equipment power: local isolators for FCU, AHU, pumps and motors.; identify motor cable cores and protective earth; flexible final connections to vibrating equipment..  Builders work: coordinate slab conduit placement before casting; wall chasing, box levels and protection of embedded conduit.

; sleeves, penetrations and approved fire stopping..  Troubleshooting: how to isolate an intermittent earth leakage fault.; investigate nuisance RCD tripping; diagnosis of an open neutral or reversed polarity..  Drawings and coordination: Interpret a DB schedule and SLD against site conditions.; cable schedule and containment coordination drawings.

; produce redline as-built updates.  Safety and permits: lockout-tagout and prove-dead procedure.; What is your response if asked to work live without authorization; working-at-height rescue planning for façade works..  Feeder pillars and trenching: feeder pillar plinth, level and cable entry preparation.; armoured cable route through ducts and manholes.

; protect duct entries from abrasion and water ingress.  LED strips and profiles: LED strip polarity, voltage drop and maximum run lengths.; install aluminum profiles for heat dissipation; solder less connections versus approved soldered joints..  Lightning protection and SPD: Identify air terminals, down conductors and test joints.

; bonding requirements at lightning protection interfaces.; SPD types 1, 2 and 3 at a basic installation level..  Retrofit and UPS solar: circuit tracing before modifying an existing DB.; shutdown approval, temporary supply and restoration checklist.; basic UPS input/output/bypass cable identification..  Material identification: Identify MCB, MCCB, RCCB and RCBO from photographs.

; Identify glands, lugs, ferrules, busbar links and heat shrink.; Differentiate XLPE/SWA/PVC, LSZH and fire-rated cables.. Quality, safety and site leadership  Carry out approved site marking, material take-off, daily planning, coordination with civil/HVAC/ELV/fire alarm teams, installation checks and as-built redlines.

 Install and test only within competence and authorization; follow permit-to-work, LOTO, prove-dead, calibrated instruments, working-at-height and approved method statements.  Maintain segregation, earthing/bonding, cable identification, manufacturer torque and IP integrity; prevent hidden joints, unsafe live work and undocumented modifications.

 Support ONU, BMS, fire alarm, lighting controls, UPS/solar and lightning protection interfaces; specialist termination/commissioning only by authorized qualified personnel. Selection and assessment Complete structured pre qualification questionnaire; supervised practical test (DB dressing, armoured cable glanding, containment, safe testing, troubleshooting and specialist interface tasks); verify photos and references.

Suggested minimum 75% technical and 70% practical, with no critical safety failure. Scores are screening aids, not substitutes for competent supervision. Performance expectations Own workmanship quality, safety, productivity, material control, timely snag closure, circuit documentation and coaching of junior electricians.

SENIOR PLUMBER – LEAD FIELD INSTALLER Department MEP – Plumbing Services Experience 7–10+ years practical plumbing experience; previous UAE experience mandatory Recruitment Candidates currently in India with previous UAE experience Employment Full-time 1.

Position Overview

We seek a technically strong, energetic and self-motivated Senior Plumber who can personally execute installations, guide junior workers and independently take charge of assigned site areas. This is a hands-on field position requiring foreman-level technical knowledge, initiative, accountability and daily productivity—not a supervisory-only role. 2. Technical Installation Experience Water Supply and Pipework  Install PPR, PEX, HDPE, CPVC, copper and applicable piping systems; perform cutting, fusion/jointing and fittings.  Execute concealed, exposed, ceiling and underground water supply networks, including supports, sleeves and insulation.  Install valves, manifolds, meters, pressure-reducing valves and associated accessories; mark routes and levels from drawings. Drainage and Sanitary  Install UPVC/HDPE soil, waste, vent and rainwater piping with correct slopes, supports and connections.  Install floor traps, cleanouts, gullies and sanitary fixtures including WCs, basins, showers and kitchen sinks.  Complete bathroom, kitchen, apartment and villa plumbing independently. Equipment, Testing and Troubleshooting  Install/connect domestic pumps, booster sets, water heaters, tanks and associated pipework.  Perform water pressure and drainage leakage tests as per approved procedures.  Diagnose and rectify leaks, blockages, low pressure, airlocks and installation defects; prepare for inspection and handover. 3. Independent Site Execution  Read approved plumbing drawings, identify installation sequences and execute assigned work without constant supervision.  Plan daily targets, materials, tools and manpower; flag shortages before they stop work.  Guide plumbers/helpers while personally carrying out critical installation work.  Coordinate with civil, electrical and HVAC teams; identify clashes and propose practical solutions.  Track progress, quality, safety and housekeeping; communicate issues and completion status to management. 4. Work Attitude and Ownership  Take initiative and move to the next productive activity without repeated instructions.  Lead by example on site; remain actively involved in installation rather than sitting and supervising.  Take responsibility for workmanship, productivity, material care, mistakes and timely rectification.  Solve routine technical problems independently; escalate changes requiring approval.  Maintain discipline, enthusiasm, teamwork and a target-oriented approach. 5. Minimum Requirements  7–10+ years of practical plumbing installation experience, with verifiable previous UAE MEP/construction experience.  Hands-on experience in villas, apartments, residential towers or commercial buildings.  Ability to interpret basic plumbing drawings, execute installations independently and troubleshoot faults.  Experience guiding helpers or junior plumbers preferred; must be physically able to work on site.  Candidates currently in India with prior UAE employment are encouraged to apply. 6. Pre-Hiring Screening  Provide updated CV, previous UAE employers, project names and employment periods.  Describe systems and activities personally installed, plus areas handled independently.  Provide salary expectation, availability and references where possible.  Shortlisted candidates will complete an experience checklist, technical interview and practical trade assessment where feasible. 7. Performance Expectations Complete assigned areas safely and to quality standards; achieve realistic daily targets; minimize rework and downtime; guide helpers productively; proactively report constraints and take ownership through testing and rectification. Hiring Priority We value practical capability, self-initiative and responsibility more than designation alone. We need someone who works like a skilled plumber, thinks like a foreman and takes ownership like a site in-charge.

Description copied from Seagullhr's careers page. Read the full posting before you apply.

More jobs at Seagullhr

See all openings at Seagullhr

More jobs in Abu Dhabi

See all jobs in Abu Dhabi